• CASE STUDY: The ShoWare Center in Kent, WA, wanted to increase uniformity of light; reduce shadowing, maintenance, and energy expenditures; eliminate spill light; and improve the guest experience with modern lighting. The old lighting was causing glare on TV broadcasts, and superficial fixes were not enough for the filming crew. Additionally, light was spilling into the seats, causing inconvenience for spectators. The HID fixtures were not controllable, lumens had depreciated significantly, and the shutter systems were failing.

    The facility then turned to 64 ArenaLED fixtures (415W) with updated controls, replacing the 1000W HIDs. This solution was developed by CED Seattle and Hubbell Lighting, and it signifcantly improved the quality of lighting in the arena.

    The new ArenaLED fixtures came with controls including wireless dimming, strobe effect, and additional functionality. They allowed the facility to develop more dramatic lighting techniques that were previously unattainable. Specialized optical control has decreased the amount of light that spills into the seats, and general aesthetics have improved. The facility will reduce energy by more than 203,000 kWh per year, adding up to $18,000 per year in savings.

    Related Content

    Courtesy of Cooper Lighting Solutions
    High-efficiency LED lighting and intelligent lighting controls can yield measurable cost savings and sustainability benefits in data centers.
    Advanced lighting strategies should be more than an afterthought in today’s data centers—they’re part of a larger optimization strategy that helps save money and ensure more efficient...
    ID 31120886 © Katarzyna Bialasiewicz | Dreamstime.com
    Is your office ready for a refresh?
    Is your office ready for a renovation? These few changes can make a major impact.
    ID 366246076 © Vitalii Shkurko | Dreamstime.com
    dreamstime_xxl_366246076
    The sale of fluorescent bulbs is banned in 16 U.S. states, with more to come. Are you ready for the move to LEDs?
    Photo by Connie Zhou / Courtesy of Lutron
    BlackRock’s office was designed to encourage collaboration.
    Explore how the team at BlackRock’s New York City headquarters used lighting, shade, and control strategies to maximize comfort and meet the company’s goals.
    Adobe stock image via Adobe Express
    To be eligible for an L-Prize, luminaires and connected systems must be in production, commercially available, and installed in a building.
    L-Prize Phase III requirements and bonus points demonstrate DOE’s emphasis on practical advances for people and the planet, writes PNNL’s KATE HICKCOX.